<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom" xmlns:content="http://purl.org/rss/1.0/modules/content/" >
   <channel>
    <atom:link href="http://ptieurope.webnode.cz/rss/aktuality.xml" rel="self" type="application/rss+xml" />
      <title><![CDATA[PTI NEWS - ptie.eu]]></title>
      <link>http://ptieurope.webnode.cz</link>
      <language>en</language>
      <pubDate>Mon, 14 Nov 2011 12:07:00 +0100</pubDate>
      <lastBuildDate>Mon, 14 Nov 2011 12:07:00 +0100</lastBuildDate>
      <category><![CDATA[PTI NEWS]]></category>
      <docs>http://blogs.law.harvard.edu/tech/rss</docs>
      <generator>Rubicus v2.0</generator>
      <managingEditor><![CDATA[brhelp@gmail.com (Petr Brhel)]]></managingEditor>
      <webMaster><![CDATA[brhelp@gmail.com (Petr Brhel)]]></webMaster>
      <item>
         <title><![CDATA[PTI Europe to revamp 20t special steel EAF at ZDAS a.s. (Czech Republic)]]></title>
         <link>http://www.ptie.eu/news/pti-europe-to-revamp-20t-special-steel-eaf-at-zdas-a-s-czech-republic-/</link>
         <description><![CDATA[
	The scope of the project is turn key revamping including new water cooling system, furnace roof with exhaust, water cooled burner / top oxygen lance on hydraulic carrier, carbon and lime injection equipment and automation system. The project will enable ZDAS to increase productivity, reduce cost and improve quality of ultra high purity steels. Equipment is due to start up in January 2012.

	
		
			
				
					Lime and Carbon injections (3D visualisation)
			
		
	
	
		
			
				
		
	


	
	&nbsp;
]]></description>
         <pubDate>Mon, 14 Nov 2011 12:07:00 +0100</pubDate>
         <guid isPermaLink="true">http://www.ptie.eu/news/pti-europe-to-revamp-20t-special-steel-eaf-at-zdas-a-s-czech-republic-/</guid>
         <category>PTI NEWS</category>
      </item>
      <item>
         <title><![CDATA[Nucor Tuscaloosa Lime Injection System Installation]]></title>
         <link>http://www.ptie.eu/news/nucor-tuscaloosa-lime-injection-system-installation/</link>
         <description><![CDATA[
	&nbsp;

	Nucor Tuscaloosa Steel Inc., located in Tuscaloosa, Alabama, USA has installed one (1) PTI ProlimeTM injection system to supply lime to their 150 ton (136 metric tonne) twin shell EAF. The PTI ProlimeTM injection system eliminated the need to add lime to the belt conveyors that bring DRI to the EAF roof.&nbsp; Eliminating the lime from the belt conveyors reduced lime dust in both the EAF and LMF work areas and allowed the DRI feed rate to the EAF to be increased.&nbsp;&nbsp; PTI...]]></description>
         <pubDate>Sat, 12 Nov 2011 11:52:00 +0100</pubDate>
         <guid isPermaLink="true">http://www.ptie.eu/news/nucor-tuscaloosa-lime-injection-system-installation/</guid>
         <category>PTI NEWS</category>
      </item>
      <item>
         <title><![CDATA[Nucor Jackson ShurStartTM  Ladle Preheater Installation]]></title>
         <link>http://www.ptie.eu/news/nucor-jackson-shurstarttm-ladle-preheater-installation/</link>
         <description><![CDATA[
	&nbsp;

	Nucor Jackson, located in Jackson Mississippi, USA has installed a PTI ShurStartTM ladle dryer for use on their 60 ton ladles (54 metric tonne).&nbsp; The PTI ShurStartTM ladle dryer controls the gas and air separately which allows for proper air fuel ratio control. The PTI Ladle Dryer is capable of maintaining temperatures as low as 200o F (90oC) and as high as 2000o F (1090o C) for sustained periods of time with even refractory heating.&nbsp; While the dryer monitors exhaust gas...]]></description>
         <pubDate>Thu, 10 Nov 2011 17:00:00 +0100</pubDate>
         <guid isPermaLink="true">http://www.ptie.eu/news/nucor-jackson-shurstarttm-ladle-preheater-installation/</guid>
         <category>PTI NEWS</category>
      </item>
      <item>
         <title><![CDATA[Nucor Jackson JetBOxTM Installation]]></title>
         <link>http://www.ptie.eu/news/nucor-jackson-jetboxtm-installation/</link>
         <description><![CDATA[
	&nbsp;

	Nucor Jackson, located in Jackson, Mississippi, USA has installed three (3) PTI JetBOxes in their 60 ton (54 metric tonne) EAF.&nbsp; Two of the JetBOXes house 5 MW, 750 scfm (1275 M3/hr) supersonic oxygen injectors and one of the JetBOxes houses a 5 MW capacity lime injection burner.&nbsp;
]]></description>
         <pubDate>Thu, 10 Nov 2011 11:54:00 +0100</pubDate>
         <guid isPermaLink="true">http://www.ptie.eu/news/nucor-jackson-jetboxtm-installation/</guid>
         <category>PTI NEWS</category>
      </item>
      <item>
         <title><![CDATA[Nucor Jackson ProlimeTM Injection System Installation]]></title>
         <link>http://www.ptie.eu/news/nucor-jackson-prolimetm-injection-system-installation/</link>
         <description><![CDATA[
	&nbsp;

	Nucor Jackson, located in Jackson, Mississippi, USA has installed one (1) PTI EAF sidewall lime injection system to replace the current system that added lime to the bottom of the EAF by a drop hopper.&nbsp; The new PTI sidewall ProlimeTM injection system eliminated three crane movements per heat and reduced the amount of fugitive lime dust entering the EAF melt platform.&nbsp; PTI provided the engineering and layout design for the material feed, transport line and EAF sidewall...]]></description>
         <pubDate>Thu, 10 Nov 2011 11:53:00 +0100</pubDate>
         <guid isPermaLink="true">http://www.ptie.eu/news/nucor-jackson-prolimetm-injection-system-installation/</guid>
         <category>PTI NEWS</category>
      </item>
      <item>
         <title><![CDATA[Nucor Hertford Ladle Preheater Installation]]></title>
         <link>http://www.ptie.eu/news/nucor-hertford-ladle-preheater-installation/</link>
         <description><![CDATA[
	&nbsp;

	Nucor Herford, located in Hertford County, North Carolina, USA has installed a PTI ShurStartTM ladle preheater for use on their 165 ton (150 metric tonne) ladles.&nbsp;&nbsp; The PTI ShurStartTM ladle preheater controls the gas and air separately which allows for proper air fuel ratio control. The PTI ShurStartTM ladle preheater is capable of maintaining temperatures as low as 200o F (90oC) and as high as 2000o F (1090o C) for sustained periods of time with even refractory...]]></description>
         <pubDate>Thu, 10 Nov 2011 11:52:00 +0100</pubDate>
         <guid isPermaLink="true">http://www.ptie.eu/news/nucor-hertford-ladle-preheater-installation/</guid>
         <category>PTI NEWS</category>
      </item>
      <item>
         <title><![CDATA[Nucor Norfolk Ladle Preheater Skid Installation]]></title>
         <link>http://www.ptie.eu/news/nucor-norfolk-ladle-preheater-skid-installation/</link>
         <description><![CDATA[
	&nbsp;

	Nucor Norfolk, located in Norfolk, Nebraska, USA has installed a PTI ShurStartTM ladle preheater skid to replace the controls on their existing horizontal ladle dryer.&nbsp; The new air and gas control train provided by PTI allows the air and gas to be controlled separately for precise air fuel ratio control at any temperature set point.&nbsp; The PTI air flow control design allowed the blower on the new control skid to be smaller than the previous blower which resulted in a 20%...]]></description>
         <pubDate>Thu, 10 Nov 2011 11:51:00 +0100</pubDate>
         <guid isPermaLink="true">http://www.ptie.eu/news/nucor-norfolk-ladle-preheater-skid-installation/</guid>
         <category>PTI NEWS</category>
      </item>
      <item>
         <title><![CDATA[Nucor Arkansas Lime Injector Installation]]></title>
         <link>http://www.ptie.eu/news/nucor-arkansas-lime-injector-installation/</link>
         <description><![CDATA[
	&nbsp;

	Nucor Arkansas, located in Hickman, Arkansas, USA has installed one (1) PTI ProlimeTM injection unit.&nbsp; The PTI ProlimeTM injection unit at Nucor Arkansas was designed with a removable hopper.&nbsp; Nucor Arkansas uses multiple hoppers to collect waste products such as lime, alloy dust, DRI dust and crushed refractory brick.&nbsp; These materials are then injected back into the EAF to recover these materials that would otherwise be landfilled.&nbsp; The elimination of the cost to...]]></description>
         <pubDate>Thu, 10 Nov 2011 11:50:00 +0100</pubDate>
         <guid isPermaLink="true">http://www.ptie.eu/news/nucor-arkansas-lime-injector-installation/</guid>
         <category>PTI NEWS</category>
      </item>
      <item>
         <title><![CDATA[Nucor Yamato Long Sump Burner Installation]]></title>
         <link>http://www.ptie.eu/news/nucor-yamato-long-sump-burner-installation/</link>
         <description><![CDATA[
	Nucor Yamato, located in Blytheville, Arkansas, USA has installed one (1) PTI long sump burner in their 150 ton (136 metric tonne) EAF.&nbsp; The long sump burner is capable of adding 5 MW of chemical energy to the EAf and injecting 750 scfm (1275 M3/hr) of supersonic oxygen.
]]></description>
         <pubDate>Thu, 10 Nov 2011 11:49:00 +0100</pubDate>
         <guid isPermaLink="true">http://www.ptie.eu/news/nucor-yamato-long-sump-burner-installation/</guid>
         <category>PTI NEWS</category>
      </item>
      <item>
         <title><![CDATA[Gallatin Steel Long Sump Burner Installation]]></title>
         <link>http://www.ptie.eu/news/gallatin-steel-long-sump-burner-installation/</link>
         <description><![CDATA[
	Gallatin Steel, located in Ghent, Kentucky, USA has installed one (1) PTI long sump burner in their 150 ton (136 metric tonne) EAF.&nbsp; The long sump burner is capable of adding 5 MW of chemical energy to the EAf and injecting 750 scfm (1275 M3/hr) of supersonic oxygen.
]]></description>
         <pubDate>Thu, 10 Nov 2011 11:48:00 +0100</pubDate>
         <guid isPermaLink="true">http://www.ptie.eu/news/gallatin-steel-long-sump-burner-installation/</guid>
         <category>PTI NEWS</category>
      </item>
   </channel>
</rss>
